Author Topic: High Speed 2 - The Getaway Restoration Complete  (Read 1166 times)

0 Members and 1 Guest are viewing this topic.

Offline ktm450

  • Trade Count: (+1)
  • ******
  • High Score Initials:
  • Forum Posts:
  • Geelong, Victoria
Re: High Speed 2 - The Getaway Restoration Complete
« on: December 30, 2009, 11:28:56 AM »
So here is a list of what was done:


-replaced all coil sleves
-replaced all rubbers
-replaced all star posts
-replaced slingshot plastics with NOS
-made plastic protectors for slings
-removed and polished every post and every screw
-a couple of small touchups
-PF completely stripped down cleaned polished and waxed
-new globes
-inserts cleaned from below playfield
-fixed a raised insert
-rebuilt all flippers, new bats, new plungers, links, and pawls. New coil sleeves and flipper bushings
-replaced pop bumper caps
-replaced pop bumper wafers
-New leg levelers
-added 3 new mirror glazed balls
-removed factory mylar with new mylar
-replaced u-turn plastic with NOS
-made new supercharger entrance plastic from Stainless steel
-new cabinet flipper buttons


A few after pics:











« Last Edit: October 20, 2011, 08:56:36 PM by ktm450 »