Looks like the rumour was wrong - I think by the statement from Gary - Expect Delays to fulfil all orders > end of April
As for design can see:
- a new train
- a bike diverter on the left side I thinking linking to a SS ramp thing across the playfield to the flame tunnel
- pinball ball donger on the bell
- no angus head - under playfield
- drops
- perspex flame tunnel on the right
- moving band figures on a graphic detailed perspex panel
amongst other things