Author Topic: Whitewater rebuild - COMPLETED!!!  (Read 4824 times)

0 Members and 7 Guests are viewing this topic.

Offline ktm450

  • Trade Count: (+1)
  • ******
  • High Score Initials:
  • Forum Posts:
  • Geelong, Victoria
Re: Whitewater rebuild - COMPLETED!!!
« Reply #90 on: July 04, 2009, 01:08:40 PM »
List of repairs:

-replaced all coil sleves
-replaced all rubbers
-replaced all star posts
-flame polished ramps
-new lower to upper and disaster drop ramps
-replaced decals under ramps
-replaced decals on top of ramp lips (lower to upper and disaster drop)
-replaced waterfall decal on left mountain
-made new plastics above insanity falls and bigfoot ramps
-replaced slingshot plastics
-made plastic protectors for slings and boulders
-removed and polished every post and every screw
-PF touchups
-repaired PF divot at no way out wireform drop
-repaired left mountains
-PF completely stripped down cleaned polished and waxed
-new globes
-inserts cleaned from below playfield
-leveled five inserts that were low
-rebuilt all flippers, new bats, new plungers, links, and pawls. New coil sleeves and flipper bushings
-replaced the 2 lock and extra ball translucent targets
-replaced pop bumper boulders
-replaced pop bumper wafers
-re-blued the spring steel flaps on the entrance to ramps
-re-blued the lower to upper ramp protector
-all new hex-screws
-New leg bolts and levelers
-added 3 new mirror glazed balls
-replaced RHS backbox speaker
-removed factory mylar replaced with new mylar
-new shooter rod and springs