Well the sheds almost Done its all wired up with heaps of power points the whole side walls points are hooked up so i can turn them all off at once
Ive also got all the ground work done for the Slab just waiting on the concreter to get back to me. Also hiding all the Cables and wires for the Lcd screens and speakers