No exciting photos for anyone unfortunately. New battery holder in CPU...All looks 100% factory. Tested the CPU to boot in HS2 last night. Booted 5/5 times so nothing else to touch on it.
5 new caps into driver board. New G.I header pins installed on PCB. Just waiting on BR's and that should hopefully finish the driver board with very little cost!.
Next - steps ramp stripped and cleaned. Metal hardware tumbled for 24hrs going back on tonight. I will aim to do an assembly a night so will do ball gate tonight as well. All coils will be tested and re-sleeved at this time.