Slowly does it - Very Hot weather is slowing me down a little ! Need some cooling in the garage.
All the playfield parts both under and on the top of the playfield are done. I've rebuilt the Large DT Bank - just took my time and now I'm installing the new Flipper kits. I move up the underside of the playfield and check every component before re assembly. Since I've done the lower flipper assemblies - with "hot" coils, I clean and prep this area ;
Here's the Large DT. I will install Mylar on each individual DT. Rebuild kits installed.
This restore will start to "speed up" as I there is minimal cleaning. Just a case of rebuilding the stepper unit and some relays. Will be fun !