Tumbler has been going non stop for a week now.
24hrs for each lot with some Brasso now.
Almost all upper playfield parts now done.
Upper pf drop targets completely stripped and rebuilt (thanks to DDSTOYS guide!)
Stencil kit arrived and spray painter is hopefully starting soon. A lot of work is going into the cab so I cannot wait to see result.
Replacement CPU board arrived. I went with a Ni-Wumph. Tested and boots well. The other board shelved for time being. I may have a lead on cheap scopes so it can wait.