Author Topic: Star Trek resto PART III. STTNG.  (Read 3659 times)

0 Members and 5 Guests are viewing this topic.

Offline Pinfan

  • Trade Count: (+2)
  • ******
  • Forum Posts:
  • Melbourne
Re: Star Trek resto PART III. STTNG.
« Reply #15 on: April 25, 2010, 11:56:30 AM »
There’s not much else I can do on the pf as in re assemble. I have left the pf as bare as possible in able to carry it myself back into the cab for when its time, just in case i have no one around to help me.  That bastard is heavy!

So I started working on the cabinet.

The entire cabinet and HB were stripped completely. All parts were left aside in their designated sections for me to attend too..

The HB was unscrewed from its supports and pulled off away from the cab.

Light board was unscrewed away from the HB and left aside in order to be dealt with individually.

All boards were pulled as well.

Now the tumbler starts working full time again.  ^^^

~ TIMBER SUPPORTS IN THE CAB ~

Both had previously been chewed up by the damage PF slide/lock in rails. These timber rails both needed to be replaced. I will address this at a later date. @@^

As i have mentioned previously the PF slide/lock rails were damaged and for quite a while the PF was chewing on these timber rails. To add more scars to the wound it started chewing up the side of the cabinet.  &^&

You will see the extent of the damage in one of the pics.  ^&^



« Last Edit: April 25, 2010, 12:04:42 PM by Pinfan »
Some people have big HEADS !