Author Topic: Star Trek resto PART III. STTNG.  (Read 3605 times)

0 Members and 3 Guests are viewing this topic.

Offline Pinfan

  • Trade Count: (+2)
  • ******
  • Forum Posts:
  • Melbourne
Re: Star Trek resto PART III. STTNG.
« Reply #30 on: April 30, 2010, 10:06:15 PM »
Thanks for the kind words guys... It is truly appreciated when you guys appreciate it !  :D

I've had a couple of big days on this restore....

Cab has been sanded, primed, painted and the decals have been installed.

Metal pf supports and leg brackets have all so been wire brushed and polished.

New black legs with all new trimming plus leg protectors have been installed to get the cab sitting on its own 4 feet.... Cabinet and hb have been reunited.

A new coin door, new flipper buttons and a new start and to be continued button have also been installed.

The gun assemble has also been stripped, cleaned, painted and rebuilt and then re installed back onto the cab...

The Borg assembly has also been stripped, cleaned, rebuilt and put aside waiting for its installation back onto the pf. I converted all lighting to leds as traditionally in the show the Borg ship is green so it has all been converted to green globes and flashers..  && I will detail what i have done to the Borg ship housing at a later date.  <.>

Its all starting to take shape now and it should move on quickly from here. I still have a bit of cleaning here there but most has been done and left aside so i can breeze through putting it back together.

Most of the PF parts are being replaced with new parts so the cleaning of the ramps, plastics, posts etc is thrown out the door !  #*#  $#$

« Last Edit: April 30, 2010, 10:17:32 PM by Pinfan »
Some people have big HEADS !