I have that sample of that elevating/reclining platform trolley coming pretty soon , can't wait to see it ,lifting to 1.4m of height for loading pinballs on to trucks in both 90 or 180 degree angle, has a gear drive to incline the table ,
So plan is to lift up the pinball, remove the legs , strap the head box down , strap the pinball on to the trolley ,raise the table 90 degress , lower platform so that pinball is sitting on it's end on the floor or a pallet .
Reverse it , lift the pinball from sitting on its end to a 180 degress , install legs and lower it .
Production of the 3 wheel dolly's and the 2 wheel movers will be finished in about a week( so I am told ) ,Then about 3 weeks on the water .
Tony