Machine------White Water Williams 1993 S/N 4760
The Aim-----Rebuild to better than new condition.
Complete Strip. New Earth Braid ETC
Full Repaint and Decals
New Mirco Playfield Installation
3D Translite
New Speaker Panel
New Cabinet Side Trim, New Glass
All aftermarket Ramps
Color DMD
HIFI Sound Board
All New Boards except CPU, small cab boards Caps Change
LED Lights
Full Mechanical & Electrical rebuild. Various Decals.
Rechrome legs, Lock Down Bar, Side Rails, and Chrome back board hinge Bracket
Powder Coat Coin Door
Early Days. Playfield is out, The Back Box has been fully stripped out, sanded back to bare wood.
I saved the WPC fuse list and it will go back in exactly the same spot. The aim is to line up the existing staples.
Polished the Brackets and sprayed with clear to prevent oxidation. Back back still needs filling and Sanding.
I work 2 Weeks on and 2 Weeks off so the work will be sporadic.
I'm in no rush so when it;s done is when it's done.