Long day today. All up I spent around 10 hrs today on the lower playfield alone and thats not even putting playfield parts back on yet.
I'm over the hump with the wiring and the lower PF is at about 98% finished. Kicking targets and slings fused as well as the drop targets (just to be safe).
Both drop targets completely stripped and rebuilt (thx again Daniels thread). New targets put in and mylared as the old ones were shot.
All transistors (under pf) upgraded and pull up resistors added (with fuse as well). Getting power to one was a bit of a journey but I've done my best to blend it in. My BH was one of the ones which missed out on this in production, so none of the wiring is there..
All pop bumpers cleaned and rebuilt. Every coil on playfield has been tested, new diode and new sleeve. All switch matix diodes (under pf) also replaced.
New pop bumper boards gone in.
Hole kicker stripped, cleaned, lubed and rebuilt. Kicking target stripped, cleaned, lubed and rebuilt.
Tomorrow I should hopefully get top side of lower pf finished.
No updates on cab yet. WIth the weather being wet, my spraypainter has had a few extra jobs come in!
I emailed PBR regarding my missing ball gate assembly and within an 1hr I had two options and one sent. Top class service.