So what appeared to be a massive of time lost to install the mylar, I've moved on and had the first clear applied and block sand to level. It is simply amazing ! Some of my touch ups around the inserts were sanded down so I re painted them with Gav's insert templates and my airbrush. The playfield has been returned to my clearcoat guy for the last couple of coats before curing - which will take 2-3 weeks. I can't wait to see the results ! I'm also having the Genire cleared at some stage and I'll cover that on it's own resto thread.